Kennedy Space Center worked with Lumina to develop the Schedule Cost Risk Assessment Model (SCRAM).
SCRAM finds the major sources of risk of delay and cost overrun, and identifies schedules to minimize those risks.
“SCRAM is considered by NASA to be a significant improvement to the state-of-the-art in schedule and cost risk analysis because it allows realistic models of schedule variables (e.g. task lengths) to be built and analyzed. Existing risk-analysis tools provided constrained and limited modeling capabilities.”
– Kennedy Space Center